CrineonERP
Book a demoMessage us on WhatsApp

From raw material to finished job, fully costed.

For fabrication yards and manufacturers that need to know what each job really cost.

  1. StoresIssued 08:40
    Plates and sections issued to WO-2026-07312.4 t · heat numbers recorded

    Material charged to the job as it leaves stores

  2. Fabrication bay 2In progress
    Job card JC-2026-1186 · skid frame welding38 of 52 joints · 0 repairs

    Every joint traced to its welder

  3. QA/QCReleased 15:20
    Final inspection passed, ready for dispatchDimensional, visual and NDT · MTCs on file

Sound familiar?

Job finished. Cost still unknown.

Materials, hours and inspections are recorded in different places, so what a job really cost only appears long after it has shipped.

Yard production12 members
  1. Segun · Production07:45

    Stores say the 12 mm plate for the skid job is finished. The count says we have six sheets.

  2. Musa · QA/QC09:20

    I need the mill certificate for heat H-4471. Who has the delivery file?

  3. Nkechi · Finance11:05

    Can anyone tell me how many hours went into the pressure vessel job?

  4. Segun · Production13:30

    Client wants dispatch Friday. Has the final inspection been signed?

  5. Bola · Stores16:10

    Somebody took welding rods without a request again.

Who it’s for

One system for the yard and the factory floor.

01

Fabrication yards

Structural, piping and pressure work built to client drawings, where every job is quoted, welded, inspected and delivered on its own terms.

  • Each welded joint traced to its welder, procedure, heat number and NDT result.
  • Drawings and procedures kept under revision control against the job.
  • Material, labour and overhead costed per work order.

02

Light manufacturing

Plants making products in batches for distributors and industrial buyers, where raw materials, yield and stock decide the margin.

  • Bills of materials and routings for every product.
  • Batches and serial numbers traced from supplier to customer.
  • Stock across raw material, work-in-progress and finished goods stores.

What you get

Six things that turn a finished job into a known number.

01 · Bills of materials and routings

Every product built the same way, every time.

Bills of materials and routings set out what goes into each item and the steps it passes through, from raw material to finished goods.

02 · Work orders and job cards

Production work issued, tracked and closed.

Work orders break each job into job cards, so the floor knows what to build next and the office sees where every job stands.

03 · Material requests and stock

Stores issue only what was requested.

Materials are requested against the job, issued from stores and transferred between them, so stock counts match what the system says.

04 · Batch, serial and weld traceability

Trace any item back to its source.

Follow material from supplier to finished item, and each welded joint to its welder, procedure, heat number and NDT result.

05 · Quality and document control

The job’s quality file builds itself.

Inspections at receipt, in process and before dispatch, with drawings, procedures and material certificates kept under revision control against each job.

06 · Job costing

Know what each job really cost.

Material, labour and overhead are gathered on every work order as the job runs, so its cost is known when it closes, not weeks later.

Controls for manufacturing and fabrication

Nothing leaves stores, or the gate, without its paperwork.

Explore Controls
  • Approvals

    Materials requested before they are issued

    Material requests are approved before stores issue anything, so every plate and rod is charged to a job.

  • Quality

    Held for inspection before dispatch

    A finished job is held until its final inspection is passed and recorded, so nothing reaches a client unchecked.

  • Compliance

    No certificate, no receipt

    Material certificates are kept against each batch, and a delivery without its certificate is not accepted into stock.

A week in the MD’s chair

Same yard. Same week. Every job costed.

Amaka ObiManaging director · fabrication yard

Show the week

Before CrineonERP

Amaka runs a fabrication yard with three jobs on the floor. She prices new work without knowing what the last job cost.

  1. MON 08:00Asks what the skid job has cost so farProduction, stores and finance each give a different answer.
  2. TUE 11:00Prices a new tender on last year’s ratesThere is nothing more recent to go on.
  3. WED 14:30A client asks for the job’s quality fileCertificates and inspection sheets are gathered from three offices.
  4. THU 10:15A stock count turns up a shortfallNobody can say which job used the missing plate.
  5. FRI 17:00The skid ships lateThe final inspection record could not be found in time.

SAT 10:00Still unsure whether the skid job made money.

With CrineonERP

Same yard, same week. Every issue, hour and inspection lands on the job as it happens.

  1. MON 07:30Sees cost to date on every open jobMaterial, labour and overhead against the budget for each.
  2. TUE 10:00Prices a tender from real job costsThe last three similar jobs are on the screen.
  3. WED 14:30Sends the client the quality fileInspections, drawings and certificates, already filed against the job.
  4. THU 09:00Stock matches the ledgerEvery issue was requested and charged to a job.
  5. FRI 15:00The skid is released on timeFinal inspection passed and recorded before dispatch.

FRI 17:00The week closes with every job’s cost known.

Built for Nigeria

Made for how Nigerian manufacturers buy, pay and report.

  • ₦ / $

    Imported materials costed

    Plate, pipe and consumables bought in dollars, costed in naira on arrival.

  • PAYE

    Payroll under the 2026 tax rules

    PAYE under the Nigeria Tax Act 2025, with pension and NHF.

  • VAT · WHT

    VAT and WHT handled

    Tax on every invoice, and WHT credit notes tied to each deduction.

  • DUE

    One compliance calendar

    VAT, WHT, NSITF, ITF and CAC returns, each with an owner and a date.

Use cases

How companies like yours use CrineonERP

  • Use case · Production

    A production manager costing a fabrication job as it runs

    Material, labour and overhead post to the work order as the job moves, so the margin is known before the invoice, not after it.

  • Use case · Quality

    A QA/QC lead receiving steel against its mill certificate

    Plate and pipe are inspected on receipt and can’t be received without their certificate, so every batch traces back to its paperwork.

  • Use case · Payroll

    An HR manager running payroll for staff in several states

    PAYE follows each employee’s state of residence under the Nigeria Tax Act 2025, with pension and NHF, and the remittance schedules are ready for every state.

FAQ

Questions from manufacturers and fabricators

Can we cost each fabrication job?

Yes. Material issued, labour booked and overhead are gathered on each work order as the job runs, so its cost is known when it closes.

Can we trace material certificates?

Yes. Material certificates are kept against each batch and heat number, and every item and welded joint traces back to them.

Does it handle make-to-order?

Yes. A sales order can raise its own work order, built from the bill of materials and routing, and costed against that order.

Can production and stores use it on the floor?

Yes. Job cards, material requests and stock issues work from a phone or tablet, so updates are made where the work happens.

See CrineonERP running your workflows.

Tell us how your company works. We’ll show you the same processes in CrineonERP, using your approval chain and your documents.

Book a demo